Head condition at an architectural opening, featuring shims as required with sealant over a backer rod at each side. Additional sealant is specified at the interior transition to maintain the building envelope seal.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership