A scheduled door frame is anchored to a concrete masonry unit wall with anchors and shims as required. A backer rod and sealant joint seal the gap between the frame and the masonry jamb. The concrete masonry unit wall construction is coordinated per structural drawings.
CMU WALL REFER TO STRUCTURAL. SCHEDULED DOOR SCHEDULED DOOR FRAME BACKER ROD & SEALANT, TYP. ANCHOR SHIM AS REQD, TYP.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership