The bottom of the operable panel door features integrated sound seals positioned above the concrete floor slab. Floor leveling is added as required over the concrete slab to ensure smooth door operation beneath the finish floor as scheduled.
FINISH FLOOR AS SCHEDULED CONCRETE FLOOR SLAB, ADD FLOOR LEVELING AS REQ'D FOR SMOOTH DOOR OPERATION BOTTOM OF OPERABLE PANEL DOOR W/ SOUND SEALS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership