A mechanical duct penetrates a framed gypsum wall assembly. The opening requires exterior building joint sealant applied continuously on all sides of the duct at the outside layer of gypsum wallboard with a maximum six millimeter gap. Two layers of acoustic insulation are installed where indicated by the wall type, accompanied by duct insulation wrapping the penetration. A minimum one hundred twenty-seven millimeter separation is required between adjacent penetrations.
DUCT INSULATION NOTE: MIN 127 MM SEPARATION BETWEEN ADJACENT PENETRATIONS. CONTINUOUS ON ALL SIDES OF DUCT SEE ASSEMBLIES 6 MAX REF 14/IA-060a FOR <100 100 OR GREATER 09 21 16 - ACOUSTIC INSULATION TWO LAYERS, WHERE INDICATED BY WALL TYPE 07 90 05 - EXTERIOR BUILDING JOINT SEALANT 6 MAX AT OUTSIDE LAYER OF GYPSUM WALLBOARD 07 90 05 - EXTERIOR BUILDING JOINT SEALANT