A scheduled door and frame assembly sits above a concrete slab with scheduled floor finishes on either side. A transition strip bridges the change in flooring materials. The maximum allowable transition height difference is limited to one-quarter of an inch.
SCHEDULED DOOR AND FRAME BEYOND CONCRETE SLAB TRANSITION STRIP, AS REQUIRED BY FINISHES SCHEDULED FINISH 1/4" MAX
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership