This concrete scissor lift pit section detail features a pit depth of one foot zero and a half inches with a two percent slope toward a central drain. A one-half-inch deep bridge recess is provided at the perimeter and must be verified with the manufacturer. Embedded angles anchor the concrete edges around the recess and pit opening.
1/2" DEEP BRIDGE RECESS VFY WITH MFR ELEVATOR DOCK LIFT 2% 2% 1'-0 1/2" 2 1/2" 1"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership