An existing centrate chute connects via a flanged joint to the centrifuge centrate piping header, featuring an approximate 6 foot 6 inch vertical clearance. A 4 inch scum line connects to the hopper alongside an existing 12 inch centrate header and associated grooved joints. Overhead cable trays and conduits route adjacent to the equipment connections.
EXISTING FLANGE EXISTING CENTRATE CHUTE (c3) EXISTING FLANGE SCUM CONNECTION TO HOPPER R EXISTING CABLE TRAY AND CONDUITS +i a o C\| C4 'h 6 " i6' '/ m V, I \ r 4 0, / +1 O CO % A* r I i \ 2 1 -0"± \ \ \ A6 EXISTING 4" SCUM <C1 CENTRIFUGE CENTRATE CONNECTION TO 12" CENTRATE HEADER - EXISTING 12 EXISTING FLANGE EXISTING GROOVED JOINT
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.