Metal stud wall framing connects to ceiling joist framing. The metal stud wall uses studs spaced per schedule with a continuous top track secured by two number eight screws at each stud. Number eight screws are spaced at eight inches on center. Ceiling joists sized per schedule tie into the framing assembly.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership