A hollow metal frame bears above a concrete slab with scheduled flooring finishes meeting at a one-quarter inch maximum transition strip. The transition strip bridges the change in floor finishes across the threshold.
HOLLOW METAL FRAME BEYOND CONCRETE SLAB TRANSITION STRIP, AS REQUIRED BY FINISHES SCHEDULED FINISH 1/4" MAX.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership