An internally wired door jamb connects to an electrical conduit routed through a roof panel with a heated pressure relief vent as required. A sealing unit by the electrical contractor is required at every entrance of the conduit into the cabinet. Electrical service must be brought through the wall without penetrating the ceiling when the cabinet is located outdoors. Sealing around the exterior and interior of the electrical conduit around the wires must be completed at every stub out. A door plug and light fixture integrate into the cabinet assembly.
DOOR ELECTRICAL CONNECTION DOOR JAMB INTERNALLY WIRED RELIEF VENT HEATED PRESSURE ROOF PANEL DO NOT PENETRATE CEILING. ENT CONDUIT (BY OTHERS) DOOR PLUG LIGHT FIXTURE INTO CABINET. SEALING UNIT (BY E.C.) NOTE: WHEN CABINET IS ENTRANCE OF CONDUIT OUTDOORS, BRING ELECTRIC SERVICE THROUGH WALL ONE REQUIRED AT EVERY (AS REQUIRED) SEALING AROUND THE EXTERIOR OF THE ELECTRICAL CONDUIT AND INSIDE AT EVERY STUB OUT: OF THE CONDUIT AROUND THE WIRES MUST BE COMPLETED.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership