Dimension control point A marks the top of the reveal and the transition for a paint color change when it occurs. Dimension control point B marks the bottom of the reveal and paint color change. The vertical distance between these two control points is dimensioned as three-quarters of an inch for each segment, totaling one and one-half inches of vertical spacing.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership