This concrete walk assembly features a thickened edge resting on compacted soil, with the slab thickness defined as twice the minimum thickness shown on civil and structural plans. The exterior edge is finished with a one-half inch radius tooled edge. Expansion joints or control joints are required at twelve feet on center in each direction, with specific finish requirements referenced on the site plan. The adjacent landscaping transitions to the walk at a finish grade of one inch for sod and one and one-half inches for ground cover. Subgrade preparation must comply with the project soils report.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe