The assembly comprises a parapet wall wrapped in a reinforced membrane secured with water cut-off mastic and bonding adhesive. A coping stone is installed per manufacturer specifications at the top of the left detail. An alternative configuration on the right shows a metal cap provided by others over the membrane termination. Bonding adhesive is not required when the flashing height is eighteen inches or less.
BONDING ADHESIVE IS NOT REQUIRED WHEN FLASHING HEIGHT IS 18" OR LESS COPING STONE INSTALL PER MANUFACTURER REINFORCED MEMBRANE WATER CUT-OFF MASTIC BONDING ADHESIVE METAL CAP (BY OTHERS) REINFORCED MEMBRANE BONDING ADHESIVE COPING STONE TERMINATION CAP FLASHING TERMINATION
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership