A scheduled glued-down carpet meets a scheduled linoleum floor at a flush interior threshold. A Schluter Schiene-E metal transition profile separates the two finished floor materials, protecting the exposed linoleum edge and maintaining a clean division. Both flooring finishes are installed per the finish plan and finish schedule.
SCHEDULED LINOLEUM FLOOR, RE: FINISH PLAN SCHLUTER SCHIENE-E TRANSITION SCHEDULED GLUED DOWN CARPET - RE: FINISH PLAN/FINISH SCHEDULE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership