The secondary roof assembly terminates at a concrete curb rising to a top of concrete elevation of 186 feet 3 inches above the main roof level of 185 feet. The roof membrane turns up the side of the curb with an eight-inch minimum vertical dimension and welds to a continuous coated metal flashing capping the curb. Mechanical equipment mounts atop the assembly.
ROOF 185' - 0" 1' - 2" 8" MIN. VARIES SECONDARY ROOF ASSEMBLY TURN ROOF MEMBRANE UP CURB & WELD TO COATED METAL CONT. COATED METAL FLASHING MECH. EQUIPMENT T.O. CONC. 186' - 3"