A scheduled door and frame assembly sits beyond a sealed concrete slab finish. The concrete slab provides the bearing substrate for the entrance threshold. Sealed concrete surfaces finish the slab on both sides of the door frame.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership