An exterior concrete slab transitions to an interior tile finish set over thickset mortar. A scheduled threshold spans the joint beneath a scheduled door and frame assembly.
OUTSIDE CONCRETE TILE OVER THICKSET MORTAR SCHEDULED THRESHOLD SCHEDULED DOOR & FRAME
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership