A stud wall supports a tile backer board finished with wall tile according to the finish legend. A metal cove trim provides the transition at the floor line where it meets the scheduled flooring.
STUD WALL. SEE WALL TYPES. TILE BACKER BOARD, SEE SPECIFICATIONS WALL TILE, SEE FINISH LEGEND METAL COVE TRIM. SEE FINISH LEGEND. (RB2) SCHEDULED FLOORING
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership