Condensate drain piping serves a blow-through air handling coil. A tee with a cleanout is installed typically at the vertical drop directly connected to the coil unit, featuring a one-half-inch minimum clearance. A union is provided typically along the horizontal run for maintenance access. The trap configuration routes the condensate through pipe segments maintaining specified vertical drops.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership