This wall and floor junction details the interface between a two-hour elevator shaft enclosure and a concrete slab on metal pan deck at the third floor level, elevation 454 feet 7 and three-quarter inches. The structural steel beam carries two-hour fireproofing protection below the floor assembly. A two-hour firestopping system is provided at the deflection head as required where the shaft wall meets the slab edge. The partition configuration includes a two-hour elevator shaft enclosure assembly alongside adjacent interior wall construction.
3RD FL. 454' - 7 3/4" 2 HR FIREPROOFING ON STRUCTURAL BEAM 2 HR ELEVATOR SHAFT ENCLOSURE CONCRETE ON MTL PAN DECK S4 2 6 S4 2 6 2 HR 2 HR S1 + 3 115 SF IDF/DATA 333 FIRESTOPPING SYSTEM AT DEFLECTION HEAD AS REQUIRED. ELEVATOR SHAFT