A phenolic wall panel assembly terminates at a scheduled metal stud partition. The phenolic wall panel returns at the end with a 3/8-inch reveal and is secured via J-channels and fixed mounting brackets anchored to the framing. Self-tapping screws fasten the brackets and framing components together, providing a rigid edge condition.
SCHEDULED PARTITION SCHEDULED PHENOLIC WALL PANEL J -CHANNEL FIXED BRACKET 3/8" 3/8"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership