A four-inch rubber base is applied to the face of a scheduled gypsum wall partition at the finished floor level. The gypsum wall assembly sits above the scheduled floor finish with top of finished floor designated as T.O. FF.
SCHEDULED FLOOR FINISH SCHEDULED PARTITION T.O. FF RUBBER BASE AS SCHEDULED 4"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership