Metal studs receive acoustic batt insulation placed in the stud cavity. The interior side is finished with five-eighths inch gypsum board, plus an additional layer of five-eighths inch gypsum board. Exterior cladding is applied to the opposite side of the framing.
5/8" GYP BD SCHD EXT CLADDING ADD 1 LAYER 5/8" GYP BD WO ACOUSTIC BATT INSUL SCHD MTD STUDS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership