A scheduled wall finish runs continuously behind the surface-mounted corner guard at an interior partition corner. The scheduled base finishes the lower wall assembly adjacent to the corner protection. Locations and specific types of corner guards and finishes are determined per the architectural finish schedule and floor plans.
SCHEDULED BASE WALL FINISH AS SCHEDULED, RUNS CONTINUOUSLY BEHIND CORNER GUARD CORNER GUARD - LOCATIONS AND TYPE PER PLAN AND SCHEDULE PARTITION SCHEDULED
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership