Scheduled sport flooring terminates against an aluminum transition strip anchored adjacent to the scheduled finish over a concrete floor. The centerline of the transition aligns with the centerline of the door or opening where applicable, with the door undercut as required to clear the transition. A maximum clearance of one-half inch is maintained at the transition assembly.
CENTERLINE OF TRANSITION TO ALIGN WITH CENTERLINE OF DOOR OR OPENING, WHERE OCCURS SCHEDULED SPORT FLOORING SCHEDULED ALUMINUM TRANSITION STRIP SCHEDULED FINISH UNDERCUT AS REQUIRED TO CLEAR TRANSITION CONCRETE FLOOR 1/2" MAX.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership