Jamb condition for a sectional overhead door with vertical lift breakaway action at loading docks and drive-in locations. The door opening is sized per the architectural door schedule beneath the roof structure. Minimum required clearance of twelve inches is maintained for the track and operating mechanism. Exterior panels are installed per exterior wall type specifications. A two percent slope is provided away from the overhead door at the floor level.
JAMB GUARD. 10 A603 DOOR OPENING SEE SCHEDULE VERTICAL LIFT (BREAKAWAY) @ DOCKS AND DRIVE-INS USE MIN. REQUIRED CLEARANCE 12± ROOF STRUCTURE EXTERIOR PANEL, SEE WALL TYPES 2% SLOPE AWAY FROM O.H. DOOR AT THIS LOCATION N.T.S A603 10 JAMB AT SECTIONAL DOOR