A higher priority partition passes continuously through the junction while two lower priority partitions abut against it from opposite sides. Jamb studs are installed as required within the wall framing. A hollow metal frame wraps the intersection at the designated door location.
DOOR LOCATION JAMB STUDS AS REQUIRED HOLLOW METAL FRAME LOWER PRIORITY PARTITION HIGHER PRIORITY PARTITION INTERSECTION AT CROSS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership