Two banks of six 4-inch conduits connect to the service run, while a 10-foot by 12-foot SCE transformer pad is provided with requirements coordinated directly with the SCE service planner. Two 5-inch conduits continue the run, with all exact electrical requirements confirmed with SCE prior to rough-in.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership