An elevator sill assembly is supported by a structural angle attached directly to the building structure at the front wall line. A grout stop is positioned below the sill adjacent to the finish floor. The elevator door jamb aligns with the sill assembly to maintain proper clearances.
ELEVATOR DOOR JAMB SILL ASSEMBLY ELEVATOR BAB FINISH FLOOR SILL SUPPORT ANGLE - ATTACHED TO STRUCTURE FRONT WALL LINE GROUT STOP SILL LINE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership