A resilient base is installed along the bottom of a scheduled partition where it meets the finished concrete floor slab. The resilient base features an eased corner detail and stands three inches tall above the finished floor datum. The specified floor finish transitions flush against the concrete slab edge at the base of the wall assembly.
RESILIENT BASE FF SCHEDULED PARTITION 0' - 0 1/8" 0' - 3" EASED CORNER SPECIFIED FLOOR FINISH
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership