A scheduled hollow metal frame connects to a two-hour rated gypsum board partition filled with acoustical and thermal insulation. A self-adhesive silicone seal is applied as needed between the frame and the scheduled door. The scheduled ceiling intersects the partition at the head according to the reflected ceiling plan.
2 HOUR RATED PARTITION SCHEDULED FRAME ACOUSTICAL / THERMAL INSULATION VARIES SCHEDULED DOOR SCHEDULED CEILING, REFER TO REFLECTED CEILING PLAN SELF ADHESIVE SILICONE AS NEEDED
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership