At rated openings, fire-rated construction is provided continuously up to the structure above. The assembly includes a swing clear hinge and maintains a scheduled opening width plus six inches for clear corridor clearance.
= CLEAR CORRIDOR SCHEDULED OPENING + 6" AT RATED OPNGS, PROVIDE FIRE-RATED CONSTRUCTION UP TO STRUCTURE SWING CLEAR HINGE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership