An exterior concrete wall receives R-21 batt insulation stick pinned with a continuously taped white vinyl-faced vapor barrier above furring. A metal stud tie back secures the assembly, with size and gauge matched to the wall as scheduled. An acoustic ceiling tile system abuts the partition maintaining a six inch minimum clearance above. Gypsum wallboard or finish wall finishes out per plans.
EXTERIOR WALL ASSEMBLY WHEN REQUIRED BY AHJ, R-21 BATT INSULATION STICK PINNED TO CONCRETE WALL WITH CONTINUOUSLY TAPED WHITE VINYL FACED VAPOR BARRIER ABOVE FURRING METAL STUD TIE BACK, SIZE AND GAUGE TO MATCH WALL CEILING AS SCHEDULED WALL PER PLANS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership