Six-inch cold-formed steel studs, designated as FCP-1, frame the pipe enclosure. The enclosure houses a tube column and plumbing components, including a roof drain and a roof overflow drain with a cow's tongue outlet, coordinated with the plumbing drawings. Wallboard and insulation finish the assembly, which is positioned adjacent to a glazed entrance system. The enclosure footprint measures one foot zero inches, with further structural and architectural references provided by detail callouts.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe