A loading dock high wall and concrete truck apron slab meet at a foundation footing with a specified finish floor elevation. Caulk is applied at the joint between the dock high wall and the truck apron slab typically. A taper of concrete against the building is provided, with the concrete truck apron slope sized per civil drawings.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership