Hollow metal door frame installed at a partition wall assembly. The wall consists of metal studs with gypsum board on both sides, as specified in the project finish schedule. Continuous sealant is applied at the junction between the hollow metal frame and the gypsum board on both sides of the opening. The door, as specified in the door schedule, sits within the frame profile.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership