The roof membrane terminates at the canopy edge and is heat welded to lap into the metal flashing. A PVC coated metal fascia drip edge extends over the membrane termination above the structural framing and gutter assembly.
PVC COATED METAL FASCIA DRIP EDGE OVER MEMBRANE TERMINATION HEAT WELD ROOF MEMBRANE TO LAP IN METAL FLASHING ROOF MEMBRANE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership