Text on the drawing
1" 2" GENERAL CONTRACTOR TO COORDINATE STAIR FABRICATOR'S REVIEW AND APPROVAL OF ADJACENT BUILDING STEEL DIMENSIONS AND DETAILS PRIOR TO STEEL FABRICATION. CONCRETE ON MTL DECK STAIR FABRICATOR TO ACCOUNT FOR LATERAL MOVEMENT OF BUILDING IN STAIR CONNECTION DESIGN. EOS 1" COLD JOINT BETWEEN CONCRETE EOS AND STAIR INFILL. FOR ADDITIONAL INFO SEE DETAIL / 4 A-610
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe