A cold-formed metal stud wall supports a five-eighths-inch gypsum board substrate set behind a mortar setting bed and porcelain wall tile finish. The outer edge of the tile terminates at a stainless steel Schluter Quadec tile transition profile. The adjacent ceiling soffit receives a scheduled finish, with reference made to the reflected ceiling plan for additional layout coordination.
REFER TO RCP METAL STUD GYP BD 5/8" PORCELAIN WALL TILE MORTAR SCHEDULED FINISH SS-SCHLUTER QUADEC TILE TRANSITION OR APPROVED EQUIVALENT
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership