Floor finishes change at the door centerline beneath the scheduled door frame. The transition alignment is coordinated per the door schedule and framed opening beyond.
CHANGE IN FLOOR FINISH TO OCCUR AT DOOR CENTERLINE SEE DOOR SCHEDULE SCHEDULED DOOR FRAME, BEYOND
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership